Chief Product Officer search.
Founder-led companies where the CEO has been the product leader, and companies where product and engineering report separately and the friction has become the roadmap.
CEO
What breaks when it is empty.
Product and engineering leadership hired together, or against each other. If the CTO is in seat, this is partly a negotiation with them.
CEO. Peer to the CTO, never under.
Shortlist in 4 to 6 weeks.
We interview the CTO before we open a CPO search. The search is partly a peer negotiation, and we would rather run that first than discover it at offer.
What one hire does to the org.
A CPO hire lights the product org under it: VP Product, Head of Design, and Head of Product Operations. It also redraws the line to engineering, and the CTO has to want that line drawn.
Seats this hire opens or changesWhere retained meets contingent.
A third when the search opens, a third when your CPO signs, a third once they have been in the seat for ninety days.
Verified before the seat is offered.
Five points, run on every executive we present, before you see the file. The stamp goes on the one-pager and travels with the candidate.
- 01
Human Verified Presence
A live video conversation with a US-based Syfter recruiter. No recorded responses, no proxies. A real person, confirmed before the file reaches you.
- 02
Geo-Location Verification
The candidate is physically where they say they are. Location fraud creates tax and employment compliance risk for the hiring company. This point removes it.
- 03
AI Interview Prevention
Camera on, no virtual backgrounds. The recruiter sees the actual environment and a person speaking for themselves. No coaching tools, no interview bots, no scripted playback.
- 04
Multi-Channel Identity Validation
LinkedIn, resume, and everything said in the interview, cross-referenced in real time. The primary defense against fabricated profiles and bait-and-switch submissions.
- 05
Syfter Trust Guarantee
Every candidate signs the Trust Guarantee before submission. Every submission carries a timestamped Certificate of Completion and the Syfter Certified stamp.
The rest of the chart.
Tell us about the CPO seat.
The reporting line, the mandate, and the date it needs to be filled. A written point of view from Steven within 48 hours.